THE 2 METER BEACON WILL GO OPERATIONAL BY THE BEGINNING OF JUNE 2021 OR EARLIER. EQUIPMENT FOR THE BEACON IS BEING LOCATED, THE ANTENNAS ARE BEING MADE READY, AND CW ID IS TO BE PURCHASED. THE BEACON WILL HAVE A POWER OUTPUT OF 1 WATT OR GREATER, LOOP AND VERTICAL ANTENNAS, ID UNIT GIVING CALL AND GRID SQUARE.