10 METER

PROGRESS REPORT AS OF JANUARY 21, 2020

WORK HAS STARTED ON THE 10 METER  BEACON,  WHICH SHALL BE THE FIRST TO START OPERATION. THE BEACON  WILL OPERATE AT A MINIMUM POWER LEVEL OF 1 WATT, CW ID (CALL AND GRID) WITH LOOP AND VERTICAL ANTENNAS 

Leave a comment