BEACON INFORMATION

BEACON PROJECT

WORK IS PROCEEDING ON THE AMATEUR RADIO BEACON PROJECT. THIS PROJECT WILL INCLUDE LOW OUTPUT POWER BEACONS FOR 50, 144, 222, 432, 902, 1,2  MHz. THE ELEVATION AT THE BEACON SITE IS APPROXIMATELY  2100 ASL. ANTENNAS  WILL BE MOUNTED ON 2 TOWERS AT ABOUT 40 FOOT AGL. THE ESTIMATED TIME FRAME FOR THE PROJECT  IS 36 TO 48 MONTHS AS OF 07/01/2024. THE 902 MHZ BEACON WILL BE OPERATIONAL BY SPING/SUMMER OF 2024. THE 144 AND 432 MHZ BEACONS WILL POSSIBLY BE ON THE AIR BY FALL/ WINTER OF 2025.

Leave a comment